Block C, Air Systems and Brake Systems: 17 of the 135 questions, RSOS tasks C-13 (air systems) and C-14 (brake systems). These are original practice notes, not materials of the Red Seal program. Inspection values come from the National Safety Code standards in force on January 1, 2027 and may vary by province (jurisdictions may vary); adjustment, torque and clearance values always come from the vehicle manufacturer's documentation; the rest is standard trade practice.
| Symptom | Likely cause | Check |
|---|---|---|
| Water in every tank | Dryer not purging | Governor signal line, purge valve |
| Oil in supply tank and cartridge | Compressor passing oil | Compressor |
| Loss only with brakes applied | Leak past the treadle valve | Service lines, relay valve, chambers |
| Pull to one side | Long stroke on the other side | Stroke on each wheel |
| One hot drum | Mechanical drag | Camshaft bushings, return spring |
| ABS lamp stays on | Stored fault | Read the ECU fault code |
Formula sheet: area = π × r² (π = 3.14) and F = A × P, with kPa × 0.001 = N/mm². A radius of 50 mm gives 3.14 × 50 × 50 = 7 850 mm²; at 600 kPa, F = 7 850 × 0.6 = 4 710 N.
1. A technician makes a full service brake application during a periodic inspection and watches the air gauges. A pressure drop of more than what value is rejected?
NSC Standard 11B, section 3A.2 rejects a system whose pressure drops more than 138 kPa (20 psi) during a full service brake application (jurisdictions may vary). The value of 7 kPa (1 psi) is the leakage limit per minute, 28 kPa (4 psi) is the trailer leakage limit per minute, and 414 kPa (60 psi) is the pressure below which the low pressure warning must have come on.
2. Which component removes moisture and oil vapour from the compressed air before it enters the supply tank?
The air dryer sits between the compressor and the supply (wet) tank and uses desiccant to remove moisture and oil vapour; it also purges that contamination out through its purge valve. The governor only controls the compressor and the purge signal, a relay valve speeds brake application at the chambers, and a check valve only keeps air from flowing backward between tanks.
3. A technician pulls out the trailer supply valve, places the trailer service line where it can be seen and makes a service brake application. What result passes the tractor protection valve test?
NSC Standard 11B, section 3A.10 runs this test with the trailer supply valve closed (pulled out) and rejects the vehicle if air flows out of the trailer service line during the service brake application, so a pass is no flow from that line (jurisdictions may vary). The tractor brakes still apply because the tractor protection valve cuts off only the trailer lines, steady exhaust from the supply line points to a leaking trailer supply valve, and the low pressure warning is a separate check.
4. With the system at normal operating pressure, a technician opens the drain valve on the supply (wet) tank, and pressure then falls in the primary tank. What does this show?
NSC Standard 11B, section 3A.5 rejects the one-way check valve between the supply tank and the service tanks when pressure drops in the primary or secondary tank after Step 1, the supply tank drain being opened (jurisdictions may vary). The two-way check valve is tested in the later steps by draining a service tank, a stuck purge valve would not pull air out of the service tanks, and the cut-in setting does not affect tank isolation.
5. A technician has chocked the wheels, released the spring brakes and lowered system pressure to 552 kPa (80 psi) or less. What is done next to complete the build-up time test?
NSC Standard 11B, section 3A.2 times the rise from 85 to 100 psi with the engine at 600 to 800 rpm, and a time of more than two minutes is rejected (jurisdictions may vary). Timing a rise from empty to cut-out at full speed is not the specified test, and timing a pressure fall or a loss with the engine off measures leakage, not compressor build-up.